SAP Production Planning
SAP Production Planning
o Discrete & Repetitive manufacturing
o Material Master
o BOM
o Work Center,
o Routing
o Production Resources/Tools
o MRP
o Production Orders
o Work Scheduling
o Planning Table
o Back Flash
o Confirmations
o Order Splitting
o Product Cost Calculator
o Settlement
Material Requirement Planning
o MRP configuration
o Master production scheduling
o Consumption based planning
o Re-order point planning
o Time phased planning
o Carrying out planning run(single item single level, single item multi level)
o BOM explosion
o BOM selection (order quantity, explosion date, production version)
o Lot sizing procedures (lot for lot, fixed, period lot sizing and optimum)
o Scheduling(forward and backward)
o Lead time scheduling
o Conversion of planned orders(purchase requisition, purchase order)
o Firming planned orders
o Special procurement key
Demand Management Planning
o Determining different planning strategies
o Like wise – make to stock
o Make to order
PRODUCTION PLANNING
Program Highlights
_ LIVE ISSUES
_ INTERVIEW QUESTIONS
_ LIVE CYCLE OVERVIEW
_ SAP HELD CD
_ RESUME PREPARATION
_ INDUSTRY LECTURES
_ ABAP OVERVIEW
_ INTEGRATION CONCEPT
*Course content is subject to theory and practical, conditions apply
o Planning with and without final assembly
o Planning at assembly level
o Determining and assigning a planning strategy
o Consumption Mode(forward and backward)
o Consumption Period
o Availability check
_ Material Requirement Planning
o Calculation of capacity requirements
o Reduction of Capacity requirements
o Scheduling elements for orders
o Capacity leveling
a. etrieval, Manipulation and updates
2. Object Oriented Concepts
a. Classes, objects or instances
b. Methods constructions
c. Interfaces
d. Inheritance & other concepts etc.